Jetstream cybernetics update
Sep. 9th, 2005 10:48 am![[identity profile]](https://www.dreamwidth.org/img/silk/identity/openid.png)
As of 10:00 am this morning, my lovely lab partner and I have managed to find the ideal myomer composition that will retain structural consistency and electrical conductivity at temperatures approaching nine hundred degrees centigrade. For reference, that's over twice what Jetstream's been clocked at during a full burn.
The software team is still grinding out the interface; at last report they're a day ahead of schedule. Those two are geniuses in every sense of the word, I'm absolutely floored.
Design of the physical cyberware is starting this afternoon - if someone can pass along a message to Sam Guthrie, I'll need to get some comparative positioning data from him since his flight power is almost identical to Jetstream's.
Am taking enforced 'sanity break' until 2 this afternoon, and will return to the lab then.
JHF
The software team is still grinding out the interface; at last report they're a day ahead of schedule. Those two are geniuses in every sense of the word, I'm absolutely floored.
Design of the physical cyberware is starting this afternoon - if someone can pass along a message to Sam Guthrie, I'll need to get some comparative positioning data from him since his flight power is almost identical to Jetstream's.
Am taking enforced 'sanity break' until 2 this afternoon, and will return to the lab then.
JHF